EPISODE 2,239: FIVE TON TRUCK TO LOAD FOR MOVIE…BUT FIRST HAD TO SHOVEL 2 TO 3 FEET OF SNOW


EPISODE  2,239:  FIVE TON TRUCK TO LOAD FOR MOVIE…BUT FIRST HAD TO SHOVEL 2 TO 3 FEET OF SNOW

alan skeoch
february 2025


Eureka!!  The new greenhouse plastic tarp and metal supports held… despite
a load of two feet of snow.   We expected a collapse.  

Next  project was to shovel out lane and get a five ton truck loaded for a
movie set. “Buy shovels and get all set people you can.Gloves absolutely 
needed as temperature will freeze fingers.”

We also had to shovel a pathway to the Quonset barn…a trench.  This  job was
not as joyful as it sounds. Took two days to complete.  Anything outside 
in the preceding storms was a giant mushroom impossible to reach.
We had five people from the movie and Marjorie hard at work.  My fingers were frozen. I was
useless as still using canes and walkers.  Too cold to take many
pictures.

Just getting the five ton truck in position for loading was an achievement.
Take a look.

alan

P.s.   Thanks to Andy R.and his helper who rebuilt the greenhouse.  It held.

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *